Built for drilling teamsBook a demo

Drilling cost against plan, every day.Not at the end of the well.

Plan a well phase by phase, record what actually happened on the rig, and see where cost is heading while you can still change it.

Well A-17Production 8½″ · day 15.6 of 24
Cost to date
$5,184,300
Plan for work done
$4,846,100
Against plan
+$338,200+7.0%
Forecast final
$9.74Mplan $9.12M
Depth against days, Well A-17Planned, actual and forecast depth curves. On day 15.6 the well is at 2,110 metres against a plan of 2,370 metres. Forecast total depth is reached on day 26.1 against a planned day 24.081624Days →01,0002,0003,000m ↓04,0008,000ft ↓Today260 m behindTD forecast · 26.1TD plan · 24.0
  • Actual
  • Approved plan
  • Forecast

The problem

Excel plans, emailed reports, ERP cost codes. And a surprise at the end.

Drilling cost lives in three places that never meet. By the time the numbers line up, the well is finished and the overrun is history.

On one well, Drillcost shows an overrun on day 9 while drilling; with spreadsheets it shows up three to six weeks after the well, when invoices and month-end close catch up.
  • Found late

    Overruns surface weeks after the money is spent

    Costs reach the ERP when invoices land, long after the well moved on.

  • No cause

    Nobody can say which operations caused them

    An over-budget total does not tell you if it was rig time, materials or price.

  • No history

    Approvals happen over email

    Which version was approved, by whom and with what changes is anyone’s guess.

  • Manual

    Comparing wells and fields is a project

    Every engineer’s sheet is laid out differently, so rollups are rebuilt by hand.

Features

One structure from the office to the rig

Five things drilling teams do every day, in one place, measured against the same approved plan.

  • Phase plans. Build each well from phases and operations with planned time, depth, cost and materials. Approval saves the baseline everything is measured against.

  • On the rig. Record time, depth and materials per operation, and unplanned work as hours off plan. No signal? Entries wait on the device and sync later.

  • Why it ran over. Every overrun is split into rig time, extra materials and prices paid, so the conversation starts from the cause, not the total.

  • Daily reports. A draft is created every night from the day’s entries. The wellsite writes it up and the engineer finalises it.

  • Rollups. Cost per metre or foot, days and variance by well, field and company, side by side, in each field’s own unit and currency.

Cost against work done

Follow the well down. Phase by phase.

Each phase is compared with its own plan as soon as the work is done, so you know where an overrun came from while the rest of the well is still ahead.

  • Surface, 17½″. Drilled to 450 m in 4.6 days against 4.0 planned. $1.23M spent against $1.18M.

    Complete+4.2%

  • Intermediate, 12¼″. Drilled to 1,850 m in 10.2 days against 9.0 planned. $3.21M spent against $3.02M.

    Complete+6.3%

  • Production, 8½″. 260 of 1,600 m drilled. $744,300 spent against $646,100 planned for the work done so far.

    In progress+15.2% so far

  • Completion. Planned at 3.0 days and $1.06M. On the current forecast it starts on day 23.1, not day 21.

    PlannedNot started

How it works

Plan. Record. Compare. On every well, every day.

The plan becomes the baseline, the rig fills in the actuals, and Drillcost does the arithmetic.

  1. 1 · Plan

    Build the well phase by phase

    Phases and operations with planned time, depth, cost and materials. Submit for review; approval saves a baseline that everything is measured against.

    • Shared catalogue of operations and materials
    • Submit → review → approve, with history
    • AFE PDF from the approved plan

    Well A-17 · Plan

    Phases and operations

    Approved · v3
    PhaseHoleTo depthDaysCost
    Surface17½″450 m4.0$1.18M
    Intermediate12¼″1,850 m9.0$3.02M
    Production8½″3,450 m8.0$3.86M
    Completion—3,450 m3.0$1.06M
    Total3,450 m24.0$9.12M

    Approval history

    1. SubmittedSenior engineerMar 3 · 16:20
    2. ReviewedCoordinator · 2 commentsMar 4 · 09:05
    3. ApprovedBaseline v3 savedMar 4 · 11:42
  2. 2 · Record

    Capture what actually happened

    The wellsite records time, depth and materials per operation, plus unplanned work as hours off plan. No signal needed; entries sync when the connection returns.

    • Actuals per operation, not per spreadsheet
    • Unplanned work tracked separately
    • A draft daily report every night
    05:48No signal

    Day 15 · Production 8½″

    Drill 8½″ section

    From1,850 m
    To2,110 m
    Hours14.0 h

    Materials

    PDC bit 8½″1 ea
    Barite12 t
    Unplanned3.5 h

    Wait on weather, crane ops suspended

    Saved on this device. Syncs when online.
  3. 3 · Compare

    See cost against plan, every day

    Cost is compared with what the plan said the work done so far should cost, so an overrun shows up while the well is still drilling, with a forecast final cost beside it.

    • Cost per depth, per day and ROP
    • Forecast final cost
    • Rollups by well, field and company

    Well A-17 · Day 15.6

    Cost against plan for work done

    +7.0%
    PhasePlan, work donePlanActualVariance
    SurfaceComplete$1,180,000$1.18M$1,230,000$1.23M+4.2%
    IntermediateComplete$3,020,000$3.02M$3,210,000$3.21M+6.3%
    Production260 of 1,600 m$646,100$0.65M$744,300$0.74M+15.2%
    To date$4,846,100$4.85M$5,184,300$5.18M+7.0%

    Forecast final

    $9.74M

    Approved plan

    $9.12M

In the box

The numbers drilling teams ask for, already worked out.

From a single operation to the whole company, recalculated with every entry from the rig.

$2,457/m

Cost per depth

$332k/day

Cost per day

18.4m/h

Drilling rate

31.5h

Hours off plan

Cost per depth, per day and ROP

By operation, by phase and for the well, alongside the hours spent off plan.

Night shift · A-17

Online
  • 19:12Trip in holeOnline
  • 21:24Drill 8½″ · 1,850 → 2,110 mOn device
  • 01:30Wait on weather · unplannedOn device
  • 03:484 entries syncedSynced

Works offline on the rig

Installs from the browser on phones, tablets and laptops. Entries wait on the device and sync when the link returns.

  • Northern BlockmUSD
  • East BasinftUSD
  • South RidgemEUR

Metres or feet, any currency

Each field sets its own depth unit and currency, and rollups compare wells side by side.

  1. Coordinator approved plan v3 and saved the baselineMar 4
  2. Field engineer logged 3.5 h unplanned: wait on weatherDay 15
  3. Senior engineer finalised the day 14 reportDay 15

Every change logged

Who changed what and when, on every well. Each company works in its own workspace; larger operators can have a dedicated database.

Exports

Out of Drillcost, into everything else.

  • Export the approved plan as an AFE PDF for sign-off and the well file.
  • Export plans and actuals as CSV for your ERP, accruals or your own models.
  • Email notifications when a plan needs review or something needs your attention.
Well A-17's plan and daily entries flow through Drillcost into an AFE PDF, a CSV cost export and email notifications.WELL A-17Plan v3 · day 15 entriesAFEPDFCOST EXPORTCSVNOTIFYEMAIL

Built for every role

Everyone does their part. Drillcost handles the rest.

Engineers plan, coordinators approve, wellsite engineers record and finance watches. Cost, depth, forecasts, reports and history are worked out in the background.

Plus an administrator role for users, roles and invitations. Companies can create their own roles too.

Compare

Drillcost vs spreadsheets and emailed reports.

Most drilling teams run on Excel, email and the ERP. Here is what changes.

Full comparison

At a glance

When overruns show up
Drillcost: The same day
Spreadsheets and emailed reports: Weeks later, when costs reach the ERP
Compared against
Drillcost: The plan for the work done so far
Spreadsheets and emailed reports: The whole-well budget
Why it ran over
Drillcost: Split into rig time, extra materials and prices paid
Spreadsheets and emailed reports: Worked out by hand, if at all
No signal
Drillcost: Works offline and syncs when the connection returns
Spreadsheets and emailed reports: Report waits until someone can send it
Approval
Drillcost: Submit, review, approve, with comments and history
Spreadsheets and emailed reports: Email threads and attachments
Comparing wells and fields
Drillcost: Rollups by well, field and company, side by side
Spreadsheets and emailed reports: Manual consolidation across files

FAQ

Questions, answered.

Something else? info@drillcost.io

Does it work at the rig without a signal?

Yes. Drillcost installs on phones, tablets and laptops as an app from the browser. Entries made without a connection are saved on the device and sync on their own when the connection comes back.

Metres or feet? Which currencies?

Both. Each field sets its own depth unit and currency, so a company can run one field in metres and US dollars and another in feet and a local currency. USD is the default.

What does “cost against plan on the work done” mean?

Drillcost compares what you have spent with what the plan said the completed operations should cost, not with the whole-well budget. Halfway through a well you see a real overrun or saving, not just how much budget is left.

Do we get an AFE?

Yes. The approved plan exports as an AFE PDF. Approval itself happens on the plan in Drillcost (submit, review, approve), and approval saves a baseline that every later comparison uses.

Does it connect to our ERP?

Not directly today. Drillcost exports CSV and PDF and sends email notifications, so cost data can go into your ERP or finance models through the files you already use.

Does it handle vendor invoices or field tickets?

Not yet. Costs, including rig day rates, are entered as cost lines against operations. Invoice matching is not part of the product today.

How is our data kept separate?

Every company gets its own isolated workspace. Larger operators can have a dedicated database. Every change is logged, and approvals keep their history.

Can we set up our own roles?

Yes. Drillcost ships with five roles (senior engineer, coordinator, field engineer, viewer and administrator), and companies can create their own.

How is it priced?

Pricing is scoped to your drilling programme. Book a demo and we will walk through your wells and quote from there.

Book a demo

See your next well against plan.

We’ll walk through a well from plan to daily cost, using your phases, units and currency.