02Coordinator · Drilling coordinators, drilling managers
Approve with the full picture. Steer before it’s too late.
You decide which plans go ahead and which wells need attention. Drillcost puts every well’s position against its plan on one screen, with the history behind each decision.
Well A-18 · Plan v2
Waiting for your review
Days
23.5
Depth
3,380 m
Cost
$8.94M
vs A-17 plan
−2.0%
Senior engineer · 16:20
Submitted. Production section reuses the A-17 bit and mud programme.
Coordinator · 08:51
Intermediate casing run looks tight at 1.5 days. Is that based on A-16?
What you do
Your work, in one place.
- 01
Review and approve plans
Plans arrive for review with their phases, costs and materials. Comment, send back or approve. Approval saves the baseline and records who approved it and when.
- 02
Assign wells to teams
Decide which team plans, records and reviews each well.
- 03
Move wells through their stages
Move each well from one stage to the next, so everyone knows where it stands.
- 04
Compare across the field
Put wells side by side on cost per metre or foot, days and variance, and see which crews and phases need attention.
Handled for you
The details, worked out.
- Notifications when something needs your attention
- A full approval history on every plan
- Hours off plan separated from planned work
- Rollups by well, field and company
- An activity log of every change
A day with Drillcost
How a coordinator uses it.
- 07:00
Scan every well
Each well’s position against plan in one view. The ones running over stand out in rose.
- 09:00
Ask why, not how much
Open the well that’s over and see the split: rig time, extra materials or prices paid.
- 13:00
Review a new plan
Comment on the casing run, send it back once, then approve. The baseline is saved with your name on it.
- 16:00
Move wells along
Assign the next well to a team and move a finished one to its next stage.
Other roles
- 01Drilling engineerBuilds and owns the well plan, keeps the catalogue of operations and materials, and finalises daily reports.Open
- 03Wellsite engineerRecords actuals and unplanned work on the rig, offline if needed, and writes daily reports.Open
- 04Finance & managementRead-only access to wells and reports: cost against plan, forecast final cost and rollups.Open
Book a demo
See your next well against plan.
We’ll walk through a well from plan to daily cost, using your phases, units and currency.